Brisa Tire Plant

Aksaray / Türkiye

Ana Yüklenici : Yeni Teknik Yapı İnşaat Ltd.

Başlangıç Tarihi : 05/2016

Bitiş Tarihi : 11/2017

İşlerin Mekanik Kapsamı

Installation, testing, pre-commissioing and commissioning support works of ;

  • Production Halls
  • Press Lines
  • Mixer Buildings #1-2-3
  • Raw Material Warehouse
  • Sulphur & Material Warehouse
  • Chiller Building
  • Machine Cooling Water Building-1 & 2
  • Compressor & Boiler Building
  • Administration Building
  • Canteen

 

  • Locker Building
  • Cement House
  • Solvent Tank & Pump Station
  • Fire Water & Foam Tank Pump Station
  • WS & Oil Tanks
  • Spare Parts Warehouse
  • Tire Test Building
  • Industrial Waste Treatment System
  • Maintenance Workshop & Office Building
Brisa Tire Plant
Brisa Tire Plant

 

BRISA decided to invest new tyre factory in Aksaray,  to meet the increasing demands of tyre.

Investment will be completed in 4 phases.

  • Phase 1 includes the followings;
  • Facility Buildings: 120.000 m2
  • Office Buidings: 8.000 m2
  • Equipment Foundations: 8.000 m3
  • Roads: 32.000 m2
  • Infrastructural Pipeline: 8.000 m
  • Landscaping: 23.000 m2

 

Fabrication, Installation, testing, pre-commissioing and commissioning support works of ;

Process Piping and Process Equipment Works

  • Low Pressure Air
  • High Pressure Air
  • Instrument Air
  • High Pressure Steam
  • Low Pressure System
  • Condensate System
  • Equipment Cooling Water System
  • Hydraulic Water System
  • Nitrogen System
  • Compressed Air For Nitrogen

 

  • Recovery System
  • Vacuum System
  • Process Oil 1267 System
  • WS23 Oil System
  • Lube Oil System
  • Water System
  • Waste Gas (Exhaust) System
  • Chiller Water System
  • Hot Water System