Main Contractor : Bechtel - (USA) , Enka A.Ş. - (Turkey) J.V.
Start Date : 01/2001
End Date : 09/2003
Adapazarı Power Plant is located 150km east of Istanbul, close to city of Sakarya. Natural gas is supplied by BOTAS, the Turkish state-owned gas company.
The plant is based on 770MW power block featuring two gas turbines, two vertical heat recovery steam generators and one 260MW steam turbine.
Gas turbines by GE, steam turbine by Alstom, HRSG by CMI, cooling system by EGI.