Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day

Mary / Turkmenistan / 2014

Main Contractor : Kawasaki -(Japan) & Renaisance Construction -(Turkmenistan)

Start Date : 01/2012

End Date : 08/2014

Electrical Scope Of Works

Electrical and instrumentation  works of;

  • Amonia Plant
  • Urea Plant
  • Power Generation and Boiler Plant
  • Boiler Plant
  • Water Treatment Plant
  • Nitrogen Production Plant
  • Utility Plant
  • Material Handling Plant

 

Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day
Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day
Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day
Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day
Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day Mary Amonia Fertilizer Plant - 1200 Tonnes Ammonia and 1925 Tonnes Urea Per Day

 

Mary Ammonia Fertilizer Plant is, located in Mary at southeast of Turkmenistan, operated by Turkmenkhimya, the Turkmen state-run chemical company.

The fertilizer complex comprises ammonia and urea plants, power generation , water treatment, nitrogen production, off-site and utility facilities.

The plant has production capacity of 1,200 tonnes of ammonia and 1,925 tonnes of urea per day.

 

Installation, testing, pre-commissioing and commissioning works for ;

  • MV System
  • LV System
  • DCS System
  • Heat Tracing System
  • Instrumentation System
  • Lighting System
  • Earthing System
  • Fire Alarm System
  • CCTV and Security System
  • Telephone and Data System

Design and Engineering works for;

Electrical System design and engineering for Non-Industrial Buildings