NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year

Obninsk / Russia / 2014

Main Contractor : Gama Endüstri Tesisleri A.Ş. - (Turkey)

Start Date : 06/2011

End Date : 07/2014

Electrical Scope Of Works

  • MV System
  • LV System
  • DCS System
  • Heat Tracing System
  • Instrumentation System
  • Lighting System
  • Earthing  System
  • Fire Alarm System
  • CCTV and SecuritySystem
  • Telephone and Data System

 

NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year
NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year
NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year
NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year
NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year NLMK Electrometallurgical Plant - 1.500.000 Tonnes/Year

 

Kaluga Elektrometalugical Plant LLC "NLMK-Kaluga" is located 80km south east of Moscow in Vorsino village.

The plant is included into the list of strategic investment projects of Russian metallurgical industry with its 1.5 million tones per year wide range production capacity of construction steel including reinforcing bars and section steel.

Production line consist of an electric arc steel meltshop and rolling shop facilities.

Production range is included rebar, angle and channel steel. Steel melting equipment by VAI SIMENS, rolling shop equipment by SMS Meer.

 

  • Installation Works
  • Testing
  • Pre-commissioning
  • Commissioning Support
  • Act & Handover Documentation