Main Contractor : GE - (USA) , Gama Power - (Turkey) Consortium
Start Date : 03/2009
End Date : 07/2010
Shatura Power Plant is located in Shatura 100km south of Moscow.
The plant has 400MW electric output with its single shaft combined cycle equipment consist of a gas turbine (GE 9FA), a generator (GE 390H), a steam turbine (GE D10) and a horizontal three pressure level heat recovery steam generator.
Gas and steam turbines by GE, HRSG by CMI