Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant

Kırklareli / Türkiye / 2017

Ana Yüklenici : Gama Power AŞ

Başlangıç Tarihi : 07/2016

Bitiş Tarihi : 12/2017

İşlerin Mekanik Kapsamı

Centerline Erection

Installation, testing, pre-commissioing and commissioning support works of ;

  • Gas Turbines, 2 x Siemens SGT5-8000H
  • Steam Turbine, 2x SST5-5000
  • Generators, 3xGE-330H
  • Condenser System,2xFW Surface Steam Condenser
  • Air Filter System and Inlet Duct
  • Lube Oil System
  • CO2 System
  • Hydrogen Dry System
  • Instrument Air System
  • Wash Water System
  • Exhaust Diffuser&Duct
  • Closed Cooling Water System
  • All on Board Piping Works
Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant
Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant
Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant
Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant
Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant Hamitabat 1200 MW Combined Cycle Power Plant - 1200 MW Combined Cycle Power Plant

 

Construction of a Combined Cycle Power Plant (CCPP) in Kırklareli with a total power output of 1,200 MW is to be realized for HAMITABAT Elektrik Üretim ve Ticaret A.Ş.. Power plant is designed for 25 years lifespan. Plant is comprised of two blocks and each block has single-shaft configuration of 1 (one) Gas Turbine Siemens SGT5-8000H, 1 (one) Steam Turbine SST5-5000, 1 (one) Heat Recovery Steam Generator.

 

Upon completion of the project, the power plant will be the highest capacity H-class among the 50 Hz market in the world.

 

HRSG ( Heat Recovery Steam Generation ) Erection

 

Installation, testing, pre-commissioing and commissioning support works of ;

  • Main Structural Steel
  • Stack
  • Modules
  • Casing
  • Drum
  • Internal Piping
  • External Piping
  • Auxiliary Steel, Platforms, Ladders etc
  • Sampling System
  • Chemical Dosing System
  • Cems
  • Feed Water Pumps
  • Main Coolig Pump House
  • Insulation
  • Painting
  • Hydro Test