Rehau PVC Factory

Kaluga / Rusya / 2007

Ana Yüklenici : Renaissance Construction - (Russia)

Başlangıç Tarihi : 06/2006

Bitiş Tarihi : 09/2007

İşlerin Elektrik Kapsamı

  • MV System
  • LV System
  • Lighting System
  • Earthing and Lightning Protection System
  • Low Current Systems
  • Building Automation System
  • Process Control System for Mixing Plant
  • Process Control System for Production Lines
Rehau PVC Factory
Rehau PVC Factory
Rehau PVC Factory Rehau PVC Factory
Rehau PVC Factory Rehau PVC Factory
Rehau PVC Factory Rehau PVC Factory

 

REHAU PVC Plant Project was implemented in three phases during 2004-2007.

It includes a PVC factory, production areas, warehouses, and administrative buildings.

The total area of the plant was 53.632m2.

 
  • Design Engineering
  • All Material Supply
  • Installation Works 
  • Testing
  • Pre-commissioning
  • Commissioning