Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer

Kırıkkale / Türkiye / 2008

Ana Yüklenici : Alsim Alarko San. Tes. A.Ş. - (Turkey)

Başlangıç Tarihi : 02/2006

Bitiş Tarihi : 08/2008

İşlerin Elektrik Kapsamı

Electrical and Instrumentation works of ;

  • Natural Draft Cooling Towers
  • Energy Production Center
  • Boiler System
  • Demineralized Water Unit
  • SRU / Sulphur Recovery Unit
  • DHP / Desulphurization Unit

 

Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer
Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer
Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer
Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer
Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer Tupras Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer

 

Tupras Refinery, was established in the middle Anatolian part of Turkey in 1986, produces petroleum derivates to supply nearby cities especially capital city of Ankara. This facility has 5 million tons/year petroleum processing capacity. Petroleum is transferred by 447km length pipeline from Ceyhan unit on the Mediterranean Sea coast.

The Tupras Kırıkkale Refinery Diesel / Kerosene Hydroprocessing and CCR Reformer project consists of the construction of annex buildings to enable increase in the production unleaded gasoline at the Kırıkkale Tupras Refinery and to procedure sulphur free diesel oil in order to obtain a higher quality, environment friendly product that conforms to EU standarts.

 

Installation, testing, pre-commissioing and commissioning works for ;

  • MV System
  • LV System
  • DCS System
  • Heat Tracing System
  • Instrumentation System
  • Lighting System
  • Earthing System
  • Fire Alarm System
  • CCTV and Security System
  • Telephone and Data System